:: Paint the outside trim & garage door
:: Pour the driveway and front walk
:: Lay the pipes for the sprinkler system
:: Fix a row of stone above the front door
:: Install the front door
:: Finish the tile
:: Lay the carpet - most carpet padding down
:: Finish installing the granite countertops
:: Do the kitchen back splash - halfway done
:: Finish the kitchen lighting: light box, bar lights, kitchen nook
:: Install the kitchen appliances
:: Install the toilets
:: Finish installing all the faucets
:: Raise three fans
:: Install the entry chandelier
:: Put the doors back on throughout the house
:: Finish the moulding & base boards
:: Install the bathroom hardware
:: Hang closet bars
:: Leveled the yard
:: Install the water heater
:: SUPER CLEAN
:: Fix all the things they've messed up along the way

Our nice curvy front walkway...

Our backsplash in the kitchen...I must say, we think the tile guy is the best thing they've got going for them. The shower he did for us is amazing, and the backsplash did not disappoint...those little black squares are black granite like the countertops.

Our bar between the kitchen and the dining nook...we saw this in a friend's house, they tiled up the bar so the walls didn't get scuffed by feet...
Seems like lots was done today...but still lots to do. Unsure of move date at this time...
1 comment:
That is some awesome tilework. I really like the idea of doing tile up the bar. I'll have to remember that!
Post a Comment